Shandong Huaheng New Materials Co., Ltd. Phase I Technical Renovation Project Environmental Impact Assessment Public Participation First Publicity
Release time:2023-08-09 15:41
  |  
Reading volume:

Shandong Huaheng New Materials Co., Ltd. processes 310000 tons of hot-dip galvanized sheet, 220000 tons of color coated sheet, 340000 tons of hot-dip aluminum zinc silicon steel plate, 350000 tons of cold-rolled steel plate and sheet, 80000 tons of transportation facilities and accessories, and 70000 tons of corrugated plate project Phase I technical transformation project
                 The first public announcement of public participation in environmental impact assessment
On August 9, 2023, Shandong Huaheng New Materials Co., Ltd. commissioned Shandong Liaotai Environmental Technology Co., Ltd. to prepare the Environmental Impact Report for the Phase I Technical Renovation Project of Shandong Huaheng New Materials Co., Ltd.'s Annual Processing of 310000 tons of hot-dip galvanized sheet, 220000 tons of color coated sheet, 340000 tons of hot-dip aluminum zinc silicon steel plate, 350000 tons of cold rolled steel plate and thin plate, 80000 tons of transportation facilities and accessories, and 70000 tons of corrugated board project, According to the "Measures for Public Participation in Environmental Impact Assessment" issued by the Ministry of Ecology and Environment (Order No. 4 of the Ministry of Ecology and Environment), the relevant information on environmental impact assessment work is hereby disclosed as follows:
(1) Basic information of the construction project
Project Name: Shandong Huaheng New Materials Co., Ltd. Annual Processing 310000 tons of Hot Dip Galvanized Sheet, 220000 tons of Color Coated Sheet, 340000 tons of Hot Dip Aluminum Zinc Silicon Steel Sheet, 350000 tons of Cold Rolled Steel Sheet and Sheet, 80000 tons of Transportation Facilities and Accessories, 70000 tons of Corrugated Plate Project Phase I Technical Renovation Project
Construction location: 100 meters south of the intersection of Ranzi Road and Provincial Road 333 in Guanxian Economic Development Zone, Liaocheng City, Shandong Province (within the existing workshop of Shandong Huaheng New Materials Co., Ltd.)
Construction Content and Scale: The project is located 100 meters south of the intersection of Ranzi Road and 333 Provincial Road in Guanxian Economic Development Zone, Liaocheng City, Shandong Province (within the existing workshop of Shandong Huaheng New Materials Co., Ltd.), covering an area of 62.3 acres. This project plans to renovate an existing 310000 ton hot-dip galvanized sheet production line, purchase two energy-saving servo systems for hydraulic stations to reduce electrical energy consumption. The thickness of the strip will be changed from 2.0mm~4.5mm to 0.12mm~4.5mm, and the width of the strip will be changed from 465mm~470mm to 465mm~1250mm. After the technical transformation is completed, the project's production capacity will not change.
Construction nature: Technical transformation
Total investment: 250 million yuan; Among them, environmental protection investment is 100000 yuan, accounting for 0.04% of the total investment.
Labor quota and work system: This project does not add any new labor quota, with an annual production of 7200 hours. The work system implements four shifts and three operations, with each shift lasting 8 hours.
According to the Guiding Catalogue for Industrial Structure Adjustment (2019 edition), this project does not fall within the scope of policy encouragement, restriction, or elimination. It is allowed to construct projects and meets the requirements of industrial policies; The project is located in Guanxian Comprehensive Industrial Park, and the planned area of the project site is industrial land, which meets the requirements of land use planning and the industrial positioning of the park.
(2) Name and contact information of the construction unit
Construction unit: Shandong Huaheng New Materials Co., Ltd
Contact person: Manager Wang
Contact number: 13376351984
Address: 100 meters south of the intersection of Ranzi Road and 333 Provincial Road in Guanxian Economic Development Zone, Liaocheng City, Shandong Province
Email: 179098444@qq.com
(3) Name of the unit responsible for preparing the environmental impact report
Evaluation unit: Shandong Liaotai Environmental Technology Co., Ltd
(4) Online link to public opinion form
According to the Measures for Public Participation in Environmental Impact Assessment, the content and format of the public opinion form shall be formulated by the Ministry of Ecology and Environment. In October 2018, the Ministry of Ecology and Environment issued a notice on the issuance of supporting documents for the Environmental Impact Assessment Public Participation Measures (Ministry of Ecology and Environment Announcement No. 48 of 2018), officially releasing the public opinion form. The public opinion form can be obtained from the Ministry of Ecology and Environment of the People's Republic of China( http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html )Download the public opinion form for environmental impact assessment of construction projects and fill it out.
(5) Ways and means of submitting public opinion forms
The public can provide opinions through the following methods:
(1) By email;
(2) Direct phone call method;
(3) How to write a letter.
During the preparation process of soliciting opinions on the environmental impact report, the public can provide opinions related to environmental impact assessment to the construction unit.


                                                                                                                               Shandong Huaheng New Materials Co., Ltd
                                                                                                                                                  August 9th, 2023